    Análise da execução do plano de assistência social em um empreendimento de geração de energia elétrica – PCH Boa Vista 2

    Thumbnail
    Visualizar/Abrir
    R - E - RODRIGO AUGUSTO DE SIQUEIRA SOUZA.pdf (578.4Kb)
    Data
    2020
    Autor
    Souza, Rodrigo Augusto de Siqueira
    Metadata
    Mostrar registro completo
    Resumo
    Resumo: A eletricidade é fundamental para o desenvolvimento de muitas atividades humanas. A implantação de empreendimentos hidrelétricos é importante para a matriz energética brasileira, porém promove vários impactos relacionados as suas fases de implantação e operação. Entre tantos, pode-se dizer que o impacto social decorrente desses empreendimentos é alvo de questionamentos e discussões por parte de vários atores, como empreendedores, órgãos públicos e sociedade em geral. Contudo, esse impacto pode ser minimizado e amenizado na medida em que atuações no âmbito da Assistência Psicossocial previstas em Plano de Assistência Social são colocados em prática junto aos moradores das áreas afetadas por empreendimentos hidrelétricos. O presente trabalho tem o objetivo de analisar as ações e metodologia que foram adotadas para contribuir para a redução do impacto social com a chegada da Pequena Central Hidrelétrica (PCH) Boa vista 2, localizada no município de Varginha/MG. De acordo com resultados positivos observados e ações desenvolvidas com a implantação do Plano de Assistência Social, pode-se observar o atendimento das exigências legais no que tange aos impactos psicossociais advindos da implantação do empreendimento
     
    Abstract: Electricity is essential for the development of many human activities. The implementation of hydroelectric projects is important for the Brazilian energy matrix, but it causes several impacts such as its implementation and operation phases. Among so many, it can be said that the social impact resulting from these ventures is the target of questions and discussions by various actors, such as entrepreneurs, public agencies and society in general. However, this impact can be minimized and mitigated to the extent that actions within the scope of Psychosocial Forecast Assistance in a Social Assistance Plan are considered in practice with residents of areas affected by hydroelectric projects. The present work aims to analyze the actions and methodology that were adopted to contribute to the reduction of the social impact with the arrival of the Boa Vista 2 Small Hydroelectric Power Plant (PCH), located in the municipality of Varginha / MG. According to the positive results observed and the actions developed with the implementation of the Social Assistance Plan, it is possible to observe the compliance with legal requirements regarding the psychosocial impacts arising from the implementation of the enterprise
     
    URI
    https://hdl.handle.net/1884/94825
    Collections
    • MBA em gestão ambiental [364]

    DSpace software copyright © 2002-2022  LYRASIS
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV
     

     

    Navegar

    Todo o repositórioComunidades e ColeçõesPor data do documentoAutoresTítulosAssuntosTipoEsta coleçãoPor data do documentoAutoresTítulosAssuntosTipo

    Minha conta

    EntrarCadastro

    Estatística

    Ver as estatísticas de uso

    DSpace software copyright © 2002-2022  LYRASIS
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV