• Entrar
    Ver item 
    •   Página inicial
    • BIBLIOTECA DIGITAL: Trabalhos de Especialização
    • Ciências Agrárias
    • MBA em manejo florestal de precisão
    • Ver item
    •   Página inicial
    • BIBLIOTECA DIGITAL: Trabalhos de Especialização
    • Ciências Agrárias
    • MBA em manejo florestal de precisão
    • Ver item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Análise técnica e operacional de derrubada de Eucalyptus dunni Maiden com Feller direcional

    Thumbnail
    Visualizar/Abrir
    R - E - DAILON JOATA PROCHNOW GOMES (1).pdf (759.8Kb)
    Data
    2020
    Autor
    Gomes, Dailon Joatã Prochnow
    Metadata
    Mostrar registro completo
    Resumo
    Resumo: Na última década, o setor florestal para acompanhar a crescente demanda por seus produtos, precisou ir em busca de avanços tecnológicos e de gestão em seus processos, resultando principalmente na mecanização das atividades de colheita florestal. No entanto, algumas empresas do setor para acompanhar este ritmo de modernização e alta produção, acabaram por ter pouca atenção à indicadores operacionais. A partir daí, o surgimento de falhas nas operações se torna presentes, prejudicando o bom andamento das atividades de colheita de madeira. Mediante o exposto, objetivou-se com este estudo realizar analisar técnica e qualitativa da operação de derrubada de árvores em povoamentos de Eucalyptus dunnii Maiden com 12 anos, por um Feller Direcional em corte raso. A análise operacional foi realizar por meio de um estudo de tempos e movimentos, buscando obter informações a respeito da produtividade, eficiência operacional, disponibilidade mecânica e grau de utilização da operação. Também, foram utilizados métodos voltados para análise da qualidade das operações como diagrama de Pareto, diagrama de Ishikawa, 5W1H e análise SWOT. A produtividade efetiva média da operação foi de 106,71 m3/he (hora efetiva), em relação a eficiência operacional, disponibilidade mecânica e grau de utilização foram de 42%, 54% e 76% respectivamente, valores que podem ser considerados baixos em comparação com a literatura. Na análise do Gráfico de Pareto, os problemas com Manutenção Reativa representam 70% do tempo despendido com interrupções, indicando carência de procedimentos voltados à gestão adequada da manutenção e também da operação. De acordo com as demais ferramentas de análise qualitativa, foi constatado que medidas voltadas à melhoria dos processos de gestão e de planejamento devem ser tomadas para que se reduza as interrupções da operação, melhorando os níveis os indicadores operacionais e reduzindo os custos de produção.
     
    Abstract: In the last decade, the forest sector, in order to keep up with the growing demand for its products, needed to go in search of technological and management advances in its processes, resulting mainly in the mechanization of forest harvesting activities. But some companies in the industry to keep up with this pace of modernization and high production ended up paying little attention to operational indicators. From then on the appearance of operations failures become present, which impairs the good progress of timber harvesting activities. The objective of this study is to report the technical and qualitative analysis of the tree felling operation in Eucalyptus dunnii Maiden stands by a Directional Feller in a clearcutting. The aim analysis was performed through a study of time and motion study to obtain information of productivity, operational efficiency, mechanical availability and degree of use of the operation. Also, methods were used to analyze the quality of operations such as Pareto diagram, Ishikawa diagram, 5W1H and SWOT analysis. The average effective productivity of the operation was 106.71 m3 / h and, in terms of operational efficiency, mechanical availability and degree of utilization were 42%, 54% and 76%, respectively, values that can be considered low compared to the literature. In the analysis of the Pareto Chart, the problems with Reactive Maintenance represent 70% of the time spent with interruptions, indicating a lack of procedures aimed at proper maintenance management and also the operation. According to the other tools of qualitative analysis, it was verified that measures aimed at improving the management and planning processes must be taken to reduce interruptions of the operation, improving levels of operational indicators and reducing production costs.
     
    URI
    https://hdl.handle.net/1884/73065
    Collections
    • MBA em manejo florestal de precisão [62]

    DSpace software copyright © 2002-2022  LYRASIS
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV
     

     

    Navegar

    Todo o repositórioComunidades e ColeçõesPor data do documentoAutoresTítulosAssuntosTipoEsta coleçãoPor data do documentoAutoresTítulosAssuntosTipo

    Minha conta

    EntrarCadastro

    Estatística

    Ver as estatísticas de uso

    DSpace software copyright © 2002-2022  LYRASIS
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV