• Entrar
    Ver item 
    •   Página inicial
    • BIBLIOTECA DIGITAL: Eventos Científicos
    • Simpósios do Programa de Pós-Graduação em Engenharia de Recursos Hídricos e Ambiental
    • I Simpósio do Programa de Pós-Graduação em Engenharia de Recursos Hídricos e Ambiental (2018)
    • Ver item
    •   Página inicial
    • BIBLIOTECA DIGITAL: Eventos Científicos
    • Simpósios do Programa de Pós-Graduação em Engenharia de Recursos Hídricos e Ambiental
    • I Simpósio do Programa de Pós-Graduação em Engenharia de Recursos Hídricos e Ambiental (2018)
    • Ver item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    UNCERTAINTY ANALYSIS IN WATER RESOURCES TIME SERIES

    Thumbnail
    Visualizar/Abrir
    1290.pdf (381.5Kb)
    Data
    2018-09-01
    Autor
    Marcelo Coelho
    Cristovão Fernandes
    Daniel Detzel
    Metadata
    Mostrar registro completo
    Resumo
    Although it is clear the need for inclusion of uncertainty analyses in water resources management, the knowledge about how to perform them is still incipient. The application of standard practices, based on probabilities theory, are challenging in environmental sciences, a field in which each event is unique. It implies considerable subjectivity for uncertainty assessment and expression. The impact of uncertainties should be understood in the statistical context, where information for planning is produced.  Statistical methods should only be applied in time series compliant with randomness, homogeneity, independence and stationarity (RHIS). Non-compliance can occur when autocorrelation, trends, cycles and/or shifts are present.  In this research, an algorithm was developed to generate synthetic time series from uncertainty intervals and verify compliance with RHIS. The method was applied in time series from the Upper Iguassu Basin in southern Brazil. Results revealed that uncertainties related to representativeness are more relevant than measurement uncertainties, and that the inherent subjectivity of uncertainty assessment and expression has little importance to this process. It was concluded that investments in well-developed monitoring strategies can provide higher benefits than more precise methods, techniques and equipments for statistical results.
    URI
    https://hdl.handle.net/1884/92080
    Collections
    • I Simpósio do Programa de Pós-Graduação em Engenharia de Recursos Hídricos e Ambiental (2018) [50]

    DSpace software copyright © 2002-2022  LYRASIS
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV
     

     

    Navegar

    Todo o repositórioComunidades e ColeçõesPor data do documentoAutoresTítulosAssuntosTipoEsta coleçãoPor data do documentoAutoresTítulosAssuntosTipo

    Minha conta

    EntrarCadastro

    Estatística

    Ver as estatísticas de uso

    DSpace software copyright © 2002-2022  LYRASIS
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV