Mostrar registro simples

dc.contributor.advisorTozzi, Marcos José, 1951-pt_BR
dc.contributor.otherOta, José Junji, 1951-pt_BR
dc.contributor.otherUniversidade Federal do Paraná. Setor de Tecnologia. Programa de Pós-Graduação em Engenharia de Recursos Hídricos e Ambientalpt_BR
dc.creatorSouza, Diego David Baptista dept_BR
dc.date.accessioned2025-01-29T20:26:44Z
dc.date.available2025-01-29T20:26:44Z
dc.date.issued2005pt_BR
dc.identifier.urihttps://hdl.handle.net/1884/3931
dc.descriptionOrientador: Marcos José Tozzipt_BR
dc.descriptionCoorientador: José Junji Otapt_BR
dc.descriptionDissertação (mestrado) - Universidade Federal do Paraná, Setor de Tecnologia, Programa de Pós-Graduação em Recursos Hídricos e Ambientais. Defesa: Curitiba, 2005pt_BR
dc.descriptionInclui bibliografiapt_BR
dc.description.abstractResumo: Através de ensaios em modelo reduzido, foi verificada a viabilidade de se reduzir o nível de água no canal de aduçao de uma Pequena Central Hidrelétrica (PCH) através de estruturas fixas instaladas no início do canal, que nao necessitam de operaçao humana (nao há comportas). Sao dois os objetivos principais para a utilizaçao destas estruturas: 1) reduzir os custos na construçao da usina através da respectiva reduçao dos muros laterais no canal de aduçao – para canais de grande extensao, este custo pode ser bastante significativo, por se tratar de usinas de pequeno porte; 2) mitigar os riscos de operaçao de comportas, que, no caso de PCH's, caracteriza-se de alto risco, tendo em vista que este tipo de usina possui reservatório de pouco volume, o que, num caso de enchente, pode causar uma rápida subida no nível da água. É de bastante interesse, portanto, manter o nível de água no canal de aduçao variando dentro de uma pequena faixa, para qualquer nível de água no reservatório. Com base nos estudos desenvolvidos, apresentam-se critérios de projeto de maneira a guiar o construtor / projetista na escolha de alternativas mais econômicas e seguras no projeto de Pequenas Centrais Hidrelétricaspt_BR
dc.description.abstractAbstract: Reduced model tests were carried out in order to investigate the feasibility ofwater level reduction in a headrace of a hydro plant installation through fixedstructures installed at the beginning of the headrace, which don’t need humanoperation (there are no gates). Such reduction was satisfactorily verified.The two main objectives for the utilization of these structures are: 1) to reducethe construction costs of the hydro plant, by the lowering of the side walls of theheadrace – for long channels, this cost can be significant, even more considering weare dealing with small plants; 2) to mitigate the risk of operation of sluice gates: in thecase of the small hydro plants, this operation is characterized by high risk, due thesmall capacity of the reservoir, causing a fast rising of the water level in case offloods. Thus, it is interesting keep the water level inside the headrace varying within ashort range, for any water level of the reservoir.In this work, design criterions are presented to guide the engineer on thechoice of more economic and safer alternatives in the design of small hydro plants.pt_BR
dc.format.extentxvii, 133f. : il. color., grafs., tabs.pt_BR
dc.format.mimetypeapplication/pdfpt_BR
dc.languagePortuguêspt_BR
dc.relationDisponível em formato digitalpt_BR
dc.subjectAbastecimento de água - Aspectos ambientaispt_BR
dc.subjectUsinas hidrelétricaspt_BR
dc.subjectRecursos Hídricospt_BR
dc.subjectNível das águaspt_BR
dc.titleRedução do nível de água em canais de adução de PCH'spt_BR
dc.typeDissertaçãopt_BR


Arquivos deste item

Thumbnail

Este item aparece na(s) seguinte(s) coleção(s)

Mostrar registro simples