• Entrar
    Ver item 
    •   Página inicial
    • BIBLIOTECA DIGITAL: Teses & Dissertações
    • Teses & Dissertações
    • Ver item
    •   Página inicial
    • BIBLIOTECA DIGITAL: Teses & Dissertações
    • Teses & Dissertações
    • Ver item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Redução do nível de água em canais de adução de PCH's

    Thumbnail
    Visualizar/Abrir
    Dissertação Completa - DIEGO.pdf (4.669Mb)
    Data
    2005
    Autor
    Souza, Diego David Baptista de
    Metadata
    Mostrar registro completo
    Resumo
    Resumo: Através de ensaios em modelo reduzido, foi verificada a viabilidade de se reduzir o nível de água no canal de aduçao de uma Pequena Central Hidrelétrica (PCH) através de estruturas fixas instaladas no início do canal, que nao necessitam de operaçao humana (nao há comportas). Sao dois os objetivos principais para a utilizaçao destas estruturas: 1) reduzir os custos na construçao da usina através da respectiva reduçao dos muros laterais no canal de aduçao – para canais de grande extensao, este custo pode ser bastante significativo, por se tratar de usinas de pequeno porte; 2) mitigar os riscos de operaçao de comportas, que, no caso de PCH's, caracteriza-se de alto risco, tendo em vista que este tipo de usina possui reservatório de pouco volume, o que, num caso de enchente, pode causar uma rápida subida no nível da água. É de bastante interesse, portanto, manter o nível de água no canal de aduçao variando dentro de uma pequena faixa, para qualquer nível de água no reservatório. Com base nos estudos desenvolvidos, apresentam-se critérios de projeto de maneira a guiar o construtor / projetista na escolha de alternativas mais econômicas e seguras no projeto de Pequenas Centrais Hidrelétricas
     
    Abstract: Reduced model tests were carried out in order to investigate the feasibility ofwater level reduction in a headrace of a hydro plant installation through fixedstructures installed at the beginning of the headrace, which don’t need humanoperation (there are no gates). Such reduction was satisfactorily verified.The two main objectives for the utilization of these structures are: 1) to reducethe construction costs of the hydro plant, by the lowering of the side walls of theheadrace – for long channels, this cost can be significant, even more considering weare dealing with small plants; 2) to mitigate the risk of operation of sluice gates: in thecase of the small hydro plants, this operation is characterized by high risk, due thesmall capacity of the reservoir, causing a fast rising of the water level in case offloods. Thus, it is interesting keep the water level inside the headrace varying within ashort range, for any water level of the reservoir.In this work, design criterions are presented to guide the engineer on thechoice of more economic and safer alternatives in the design of small hydro plants.
     
    URI
    https://hdl.handle.net/1884/3931
    Collections
    • Teses & Dissertações [10558]

    DSpace software copyright © 2002-2022  LYRASIS
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV
     

     

    Navegar

    Todo o repositórioComunidades e ColeçõesPor data do documentoAutoresTítulosAssuntosTipoEsta coleçãoPor data do documentoAutoresTítulosAssuntosTipo

    Minha conta

    EntrarCadastro

    Estatística

    Ver as estatísticas de uso

    DSpace software copyright © 2002-2022  LYRASIS
    Entre em contato | Deixe sua opinião
    Theme by 
    Atmire NV